Journal cover Journal topic
Journal of Sensors and Sensor Systems An open-access peer-reviewed journal
Journal topic

Journal metrics

Journal metrics

  • CiteScore value: 1.05 CiteScore 1.05
  • SNIP value: 1.044 SNIP 1.044
  • SJR value: 0.289 SJR 0.289
  • IPP value: 0.85 IPP 0.85
  • h5-index value: 8 h5-index 8
  • Scimago H index value: 5 Scimago H index 5
Volume 7, issue 1
J. Sens. Sens. Syst., 7, 339-347, 2018
https://doi.org/10.5194/jsss-7-339-2018
© Author(s) 2018. This work is distributed under
the Creative Commons Attribution 4.0 License.

Special issue: Evaluating measurement data and uncertainty

J. Sens. Sens. Syst., 7, 339-347, 2018
https://doi.org/10.5194/jsss-7-339-2018
© Author(s) 2018. This work is distributed under
the Creative Commons Attribution 4.0 License.

Regular research article 07 May 2018

Regular research article | 07 May 2018

Test equipment and its effect on the calibration of instrument transformers

Enrico Mohns and Peter Räther Enrico Mohns and Peter Räther
  • Physikalisch-Technische Bundesanstalt (PTB), Bundesallee 100, 38116 Braunschweig, Germany

Abstract. State-approved test centres in Germany supplying accuracy tests for instrument transformers must, in the future, provide measurement uncertainty budgets for their quality management systems. In this work, the cause of ratio error and phase displacement of instrument transformers are therefore discussed. The traceability to the national standards of PTB, the attainable uncertainty, and the permitted error limits of test equipment for testing instrument transformers are presented. Finally, an example of an uncertainty budget for a current transformer of the class 0,2S is given.

Publications Copernicus
Special issue
Download
Short summary
Test centres supplying accuracy tests for instrument transformers must provide measurement uncertainties for their quality management. In this work, ratio error and phase displacement of instrument transformers are discussed. The traceability to the national standards of PTB, the attainable uncertainty and the permitted error limits of test equipment for testing instrument transformers are presented. An example of an uncertainty budget for a current transformer of the class 0,2 S is given.
Test centres supplying accuracy tests for instrument transformers must provide measurement...
Citation
Share